How to use this checklist

A trade secret defense is mostly a sequencing problem. The worst losses happen in the first week, and the most useful evidence (logs on rolling retention, memories, an engineer's old laptop) disappears quietly if nobody moves. Work phases 0 through 3 at once and in order. Phases 4 through 7 overlap. Phases 8 through 12 follow the docket.

The checklist assumes a federal claim under the Defend Trade Secrets Act (DTSA) with a parallel state claim. California differences are noted because they change the proof. Assign an owner and a date next to each task you adopt. Tasks that do not apply can be struck, but note why, because the reason may matter later.

For the reasoning, read Defending a Trade Secret Claim: Reverse Engineering, Independent Development, Public Disclosure, and Readily Ascertainable Information. For the narrative with sample language, use Building a Trade Secret Defense From the First Demand Letter: A Practical Guide. For the forms, go to the Trade Secret Defense Toolkit: Independent Development Records, Public Domain Charts, and Bad Faith Fee Motions.

Phase 0: Containment (first 48 hours)

  • Stop casual discussion of the letter. Issue a short counsel-directed note: no chat or email about the merits, no product comparisons, no looking for old files. Privilege protects communications for legal advice under Upjohn Co. v. United States, 449 U.S. 383 (1981); it does not protect a joke in an engineering channel.
  • Log the letter. Record date and manner of receipt, sender, claimed owner, statutes cited, claimed information, deadline, and other recipients. Note: Receipt may change state of mind going forward. Knowledge or "reason to know" is an element for some forms of misappropriation under 18 U.S.C. § 1839(5).
  • Calendar the deadline and the likely emergency window. A letter's deadline is not binding. A TRO application could follow it, and sometimes precedes it.
  • Compute a preliminary limitations date. Three years back from today under 18 U.S.C. § 1836(d). Note public launches, trade shows, and departures before that date.
  • Notify insurers and check indemnities. Tender under any policy that could respond, and review vendor, customer, and investor agreements for notice duties.
  • Decide who speaks to the sender. One person, normally outside counsel.

Red flag: Someone has already responded informally ("we'd be happy to look into it") or forwarded the letter with commentary. Preserve those messages, do not repeat them, and assume they will be produced.

Phase 1: Preservation

  • Issue a written hold. The duty attaches when litigation is reasonably anticipated. Zubulake v. UBS Warburg LLC, 220 F.R.D. 212 (S.D.N.Y. 2003). The sanctions framework for lost electronic data is Fed. R. Civ. P. 37(e). See Litigation Hold and Evidence Preservation Checklist: A Practical Checklist.
  • Lock source control. Turn on branch protection, disable force pushes, stop automatic branch deletion, and make a mirror clone with all refs. Save hashes of the mirror. Note: Ordinary rebases and squash merges destroy history that could be your best evidence. New commits may continue.
  • Capture hosting provider and CI logs. Export audit logs, push events, pull request data, build logs, and artifact listings, and extend retention. Note: These are often on short rolling windows, and they are the third-party anchors for git dates.
  • Suspend auto-deletion in chat, email, ticketing, and shared drives. Cover ephemeral and personal messaging used for work.
  • Secure lab and plant records. Notebooks, batch records, retained samples, certificates of analysis, supplier invoices, and instrument computers.
  • Pull departed-employee devices from any reimaging queue, and stop mailbox deletions.
  • Preserve AI tool records. Prompt histories and assistant logs, wherever retained.
  • Identify personal accounts and devices of accused people. Collect by vendor. Do not self-collect.
  • Quarantine, never destroy, anything that looks like claimant material. Move custody to outside counsel or a neutral vendor, with a log, and without opening it more than necessary.
  • Respond to any "return or destroy" demand in writing. State that you are preserving and will discuss a protocol.

Red flag: An engineer says "I deleted it when the letter came, to be safe." Stop, image the device immediately, consult forensic help about recovery, and treat this as a potential Rule 37(e) problem that counsel needs to manage now.

Phase 2: Representation and privilege

Phase 3: Fact finding

Red flag: Your first big commit or first good batch appears right after a hire, and nothing earlier exists. Find the explanation before anyone signs a denial. If there is none, change the strategy.

Phase 4: Responding to the letter

Phase 5: Forcing identification

Red flag: Your engineers ask to see the plaintiff's identification. Do not allow it until you have thought through the protective order and clean team consequences. Exposure can undermine future independent development.

Phase 6: Element-by-element screen

Is it secret?

Measures and value

Acquisition, use, knowledge

Time, displacement, and other defenses

Phase 7: Independent development and reverse engineering proof

Red flag: A witness can only say "that's just how you do it." Find the textbook, class notes, or earlier project that shows it, or expect the jury to infer that the source was the former employer.

Phase 8: Pleadings and Rule 11

Phase 9: Emergency relief

Red flag: A proposed order prohibits use of "confidential information." Object. It is unworkable, overbroad, and inconsistent with Rule 65(d).

Phase 10: Discovery

Phase 11: Summary judgment and experts

  • Move on identification, with the plaintiff's own lists as exhibits. NEXT Payment; IDX.
  • Move on public disclosure with an element-by-element chart and pin cites.
  • Move on no use, with declarations and with similarity limited to innovative features. Stratienko.
  • Move on limitations with the plaintiff's documents. Insulet.
  • Move on displacement and contract terms where the issues are legal.
  • Anticipate a Rule 56(d) request. A premature motion can be reversed. InteliClear, LLC v. ETC Global Holdings, Inc., 978 F.3d 653 (9th Cir. 2020).
  • Challenge any expert whose similarity opinion ignores the public domain.

Phase 12: Trial, fees, and resolution

Red flag: A settlement requires your team to certify that it "does not possess any confidential information of the claimant." Your engineers cannot give that certification without being told what the information is. Tie it to a specific list and a specific forensic process.

This checklist is a general working aid, and it does not replace advice about your own facts, contracts, and forum.

Related Documents

Related Articles

Related Guides

Related Checklists

Related Toolkits